Publicity of environmental protection measures for construction projects

2018-01-06 00:00:00
times

Environmental protection measures propaganda for the construction project of environmentally friendly cellulose sponge new material production project (the first phase of 50,000 (20,000 cubic meters)/annual production line of cellulose sponge blocks)
1. Dust:
(1) During the construction period, a strict sprinkler and dust removal system (timing, fixed point, fixed point) should be formulated, and special personnel should be assigned to clean up the site and construction roads.
(2) Sand, cement, gravel and other materials that are prone to sand and dust should be covered with tarpaulins to control the speed of construction vehicles and prevent materials from falling and generating dust.
(3) Cement and other flying fine-grained bulk materials should be placed in temporary warehouses or tightly covered to prevent leakage and flying during transportation, and should be unloaded in the warehouse as much as possible, and sprinkled and wetted. The sand and gravel materials at the construction site are evenly stacked, and the cement is stored in a special warehouse to reduce the number of processing links.

木浆棉抹布厂家

(4) During the operation of fiber materials, anti-flying measures should be taken, and residues and wastes should be recovered in time.
(5) Effective dust-proof measures should be taken when cutting insulation materials, walls and floor tiles, and the site should be cleaned up in time.
(6) During the excavation process, spray water on the working face and soil piles to maintain a certain humidity to reduce the amount of dust. The excavated soil and construction waste should be transported in time to prevent the surface from drying and dusting or being washed away by rain.
(7) Fences or partial fences should be set up at the construction site to control the scope of dust diffusion.
(8) When the wind speed is too high, the construction should be stopped. Covering measures have also been taken for building materials such as accumulated sand and silt.
(9) Road hardening.
Solid waste:
(1) Sort and collect solid waste, centrally store domestic waste and construction waste, and dispose of it regularly;
(2) Domestic waste should be disposed of in the office area, and the environmental sanitation department should be entrusted to clean it up regularly.
(3) Take saving measures to avoid wasting building materials, use recyclable materials as much as possible, and reduce construction waste.
noise:
(1) Strictly abide by the relevant regulations on construction noise management, and prohibit high-noise construction at night;
(2) Use low-noise construction tools and low-noise construction methods.
(3) Set up shelters around high-noise equipment.
Wastewater:
(1) Relying on the toilets that have been built in the factory, the domestic sewage produced is sent to the domestic sewage treatment facilities for treatment;
(2) Temporary sewage treatment facilities such as sedimentation tank and oil separation tank shall be constructed for construction wastewater.

Tags

Recently Viewed:

Related products

news.related_news

WeChat public account

Contact Us

Contact us

Telephone:0086-515-68859695           Cell phone:0086-17849159602

E-mail:hfhm39@hfhmc.net

Electronic fax:0086-515-68859692

Address: Zhangjian North Road, Economic Development Zone, Dafeng District, Yancheng City, Jiangsu Province, China